How to lay a concrete shed base (UK guide)

A concrete base is the most solid foundation you can give a shed: flat, dry and long-lasting. It’s a satisfying weekend job if you plan the materials and the pour properly.

The short version

Mark out a base the size of your shed’s footprint (or slightly larger), dig out about 175–200 mm, compact 75–100 mm of MOT Type 1, set timber formwork, and pour 100 mm of concrete. For a 3 × 2.4 m shed that’s about 0.72 m³ of concrete, roughly 11 bags of cement with 1.6 tonnes of ballast if you mix your own.

Finished concrete shed base

How big should the base be?

Most shed makers recommend a base that matches the shed’s footprint, or one that’s slightly larger so you have a little working room. Check your shed’s instructions: some prefer the walls to sit just inside the edge so rain runs off rather than onto the base. Measure the floor frame, not the roof, which overhangs.

The layers

LayerDepthNotes
MOT Type 1 sub-base75–100 mm, compactedFirm, level support. Go deeper on soft ground.
Damp-proof membrane (optional)—Polythene under the concrete helps keep the base dry
Reinforcement mesh (optional)Set within the slabA142 helps control cracking, especially on softer ground
ConcreteAbout 100 mmThick enough for a typical garden shed

Preparing the ground

Compacted sub-base for a patio
  1. Mark the area with pegs and string, and check it’s square by measuring both diagonals: they should be equal.
  2. Dig out turf and soil to about 175–200 mm.
  3. Spread MOT Type 1 in layers and compact each with a plate compactor.
  4. Build timber formwork around the edge with the top set at the finished concrete height, and check it’s level.

Mixing and pouring

Pouring ready-mix concrete for a shed base

For a base this size you can mix your own, use bags, or order ready-mix. If mixing, a common recipe is 1 part cement to 5 parts all-in ballast. Mix in a cement mixer, adding water gradually until the concrete is workable but not runny.

  1. If using mesh, set it on spacers so it sits within the slab, not on the ground.
  2. Fill the formwork, working the concrete into the corners with a shovel.
  3. Level it by drawing a straight timber board across the formwork in a sawing motion (tamping).
  4. Finish the surface with a float for a smoother top.

Worked example: a 3 × 2.4 m base

ItemAmountCalculator
Concrete (100 mm)0.72 m³Concrete
Or mix your own at 1:5About 11 × 25 kg bags of cement and 1.6 t of ballastBallast and cement
MOT Type 1 (100 mm)About 1.5 t: two 0.85 t bulk bagsMOT Type 1
A142 mesh (optional)1 standard 4.8 × 2.4 m sheet, cut to sizeConcrete mesh

Add about 10% to the concrete for uneven ground. If you’d rather not mix 0.72 m³ by hand, see our guide to bags, ready-mix or on-site mixed concrete.

Curing

Keep the concrete damp and covered for the first few days, and protect it from frost and heavy rain. Concrete gains most of its strength over the first week or so; wait at least several days before building the shed on it, and follow your shed maker’s guidance.

Mistakes to avoid

  • A base that isn’t square: check the diagonals before pouring.
  • Skipping the sub-base on soft or clay ground.
  • Too wet a mix, which weakens the concrete.
  • Pouring in frost, or with frost forecast.
  • Running short: always add a margin.

Barrowload guide · UK · Figures are typical; always check your product and local rules.