How much ballast and cement do I need?
Concrete materials = slab volume × 1.54 (dry materials shrink when mixed), split by the mix ratio. A 3 m × 3 m slab, 10 cm thick, at 1:5: Buy 14 × 25 kg bags of cement and 1.96 tonnes of ballast. Add about 10% for waste.
On this page

Key facts
- 1:5 cement to all-in ballast is a common general-purpose UK mix.
- Dry materials need about 1.54 times the finished volume.
- 1 m³ of 1:5 concrete needs about 370 kg of cement (15 × 25 kg bags) and about 2.2 tonnes of ballast.
- For more than about half a cubic metre, ready-mix is usually easier.
Common mix ratios
| Ratio | Typical use |
|---|---|
| 1:4 | Stronger concrete, e.g. for drives |
| 1:5 | General purpose: slabs, bases, paths |
| 1:6 | Foundations and footings |
Ratios are by volume, cement first. Follow any engineer’s specification for structural work.
Mixing tips
- Mix dry materials first, then add water a little at a time.
- Too much water weakens concrete; aim for a workable, not runny, mix.
- Keep cement dry and use it before its use-by date.
- Hire a mixer for anything more than a few barrow loads.
What mistakes should I avoid?
- Forgetting the 1.54 dry-volume factor, and running short.
- Adding too much water.
- No extra for waste: add about 10%.
- Old or damp cement, which won’t set properly.
How is it calculated?
Dry volume = slab volume × 1.54. Each material = dry volume × its share of the ratio. Cement is converted at 1,440 kg per m³ into bags; ballast at about 1.7 t/m³.
Worked examples
Garden slab: Buy 14 × 25 kg bags of cement and 1.96 tonnes of ballast. Add about 10% for waste.
Small shed base (2.4 × 2.4 m): Buy 9 × 25 kg bags of cement and 1.26 tonnes of ballast. Add about 10% for waste.
What figures do we use?
- Dry-volume factor of 1.54
- Cement at 1,440 kg per m³
- All-in ballast at about 1.7 t/m³
These are typical figures; your materials and supplier may differ.
Common questions
How many bags of cement per cubic metre of concrete?
About 15 × 25 kg bags at 1:5.
Why multiply by 1.54?
Dry sand, aggregate and cement have air gaps that close up when mixed with water, so you need more dry material than the finished volume.
What is ballast?
All-in ballast is a ready mix of sharp sand and gravel, so you only add cement and water.
Bags of premix or mix my own?
Premix bags are convenient for small jobs; mixing your own is usually cheaper for larger ones.
How much water do I add?
Add gradually until the mix is workable but not sloppy. Too much water weakens concrete.
Do I need to add extra?
Yes, about 10% for waste and uneven ground.