Barrowload

Home / Australia calculators / Building and hardscape

Concrete calculator

Work out concrete for slabs, pads and footings. Australian units: metres, centimetres and litres. Results update as you type.

How much concrete do I need?

Concrete needed = length × width × depth. An area of 3 m × 3 m at 10 cm deep needs 0.9 m³, about 1.94 tonnes. Order 97 × 20 kg bags, or 0.9 m³ of premixed concrete. Order 5–10% extra, as running short mid-pour weakens the slab.

On this page
Levelling a concrete slab

Key facts

  • 1 m³ of concrete needs roughly 108 × 20 kg premix bags.
  • A 10 cm slab suits paths and shed bases.
  • Order about 5–10% extra.
  • Premixed concrete is usually easier for larger slabs.

How thick should a concrete slab be?

Common thicknesses for garden and home projects; follow local rules and any engineer’s design:

ProjectTypical thicknessNotes
Paths and garden pads7.5–10 cmFoot traffic
Shed and summerhouse bases10 cmOn a compacted sub-base
Driveways and parking10–15 cm or moreOften reinforced

Bags or ready-mix?

Premix concrete is sold in 20 kg bags at Bunnings, which works out at roughly 108 bags per m³. For slabs over about half a cubic metre, ordering ready-mixed concrete from a local supplier is usually easier and more consistent.

Preparing for a pour

  • Compact a sub-base first; see the sub-base calculator.
  • Build level formwork to the slab thickness.
  • Check access for a mixer or truck.
  • Plan for curing: keep the slab damp and protected for several days.

How do I work out the cost?

Enter the price per bag in the calculator and it multiplies it by the quantity you need to give an estimated total. Use the Check prices links to see current prices from local retailers. For bulk deliveries priced per tonne or per m³ (or per ton or cubic yard), multiply the quantity in the results by the supplier’s rate instead.

Remember to budget for delivery, any minimum-order or part-load charges, and tool or mixer hire. Prices vary by region and supplier, so compare a few quotes.

What mistakes should I avoid?

  • Not ordering extra, then running short.
  • Uneven ground making the slab thicker than planned.
  • Pouring onto soft soil without a sub-base.
  • Mixing too wet, which weakens concrete.

How is it calculated?

Volume = length × width × depth, with depth converted to metres (cm ÷ 100). Circles, triangles and L-shapes use the matching area formula. Bag counts use about 2.15 tonnes per m³ of mixed concrete, close to the yield printed on common bags. Bags and bulk amounts are rounded up, because you can’t buy part of a bag.

Worked examples

Garden slab: 3 m × 3 m at 10 cm deep = 0.9 m³, about 1.94 tonnes. Order 97 × 20 kg bags, or 0.9 m³ of premixed concrete.

Shed base: 3 m × 2 m at 10 cm deep = 0.6 m³, about 1.29 tonnes. Order 65 × 20 kg bags, or 0.6 m³ of premixed concrete.

Common questions

How many 20 kg bags in a cubic metre?

Roughly 108, depending on the mix.

How thick should a shed base be?

About 10 cm on a compacted sub-base.

Should I add extra?

Yes, about 5–10% for uneven ground and spillage.

When is ready-mix worth it?

For most slabs over about half a cubic metre, where mixing by hand becomes slow and heavy.

How long does concrete take to cure?

It can usually be walked on after a day or two, but takes weeks to reach full strength. Keep it damp while curing.