How to lay a patio (UK guide)

A good patio is mostly about what’s underneath it. Slabs laid on a solid, compacted sub-base and a full bed of mortar stay flat for years; slabs laid on a few dabs of mortar over loose soil rock and crack within a winter or two.

The short version

Dig out about 16–17 cm. Lay 100 mm of compacted MOT Type 1, then bed each slab on a full layer of mortar about 40 mm deep, with a gentle fall away from the house. For a 4 × 3 m patio in 600 × 600 mm slabs, that’s about 34 slabs, three bulk bags of Type 1, and 8 bags of cement with 0.82 tonnes of sharp sand.

Laying patio paving slabs

Before you start

Height. Keep the finished patio at least 150 mm below your damp-proof course, the line usually visible a couple of bricks above the ground.

Fall. Slope the patio away from the house so rain runs off. A fall of around 1 in 60 is commonly used: about 5 cm over 3 m.

Where the water goes. The run-off needs somewhere to soak away, such as a lawn, a border or a drain.

The layers, from the bottom up

Compacted sub-base for a patio
LayerDepthNotes
MOT Type 1 sub-base100 mm, compactedThe strength of the patio. Compact in layers.
Mortar bedAbout 40 mmSharp sand and cement, about 4:1, laid as a full bed under each slab
SlabsAbout 20–25 mmPorcelain is thinner; natural stone varies
JointsAbout 10 mmFilled with mortar or a brush-in jointing compound

Add those up and you need to dig out roughly 16–17 cm below the finished height, a little more for thick natural stone.

Worked example: a 4 × 3 m patio

ItemAmountCalculator
600 × 600 mm slabs (10 mm joints, 5% extra)34 slabsPaving slab
MOT Type 1 at 100 mmAbout 2.5 tonnes: three 0.85 t bulk bagsMOT Type 1
Mortar bed at 40 mm, 4:18 × 25 kg bags of cement and 0.82 t of sharp sandSand and cement
Soil dug out (12 m² × 17 cm)About 2 m³, or 2.6 m³ once looseSkip size

Choosing your slabs

Slab typeGood pointsWatch out for
PorcelainHard-wearing, stain-resistant, consistent sizesNeeds a bonding primer; harder to cut
Natural sandstoneWarm, natural look; each slab is uniqueVaries in thickness; may need sealing
ConcreteBudget-friendly, wide range of finishesColours can fade over time

Tools you’ll need

A spade, wheelbarrow, rake, string lines and pegs, a long spirit level, a rubber mallet, a pointing trowel and a cement mixer. Hire a plate compactor for the sub-base, and an angle grinder with a suitable blade if you need to cut slabs (porcelain needs a dedicated porcelain blade). Wear gloves, eye protection and a dust mask when cutting.

Laying the slabs

Spreading a mortar bed for patio slabs
  1. Set out string lines at the finished height, including the fall.
  2. Mix a small batch of mortar, damp and workable rather than wet. Only mix what you can lay in about an hour.
  3. Spread a full bed for one slab at a time, slightly thicker than needed.
  4. Lay the slab and tap it down with a rubber mallet until it’s level with the string line and the fall is right.
  5. Use spacers to keep the joints even, and check with a spirit level as you go.
  6. Leave it to set, keeping off it for a day or two, then fill the joints.

If you’re using porcelain, most manufacturers recommend painting the back of each slab with a bonding primer before laying, because porcelain absorbs so little water that ordinary mortar struggles to grip it.

Mistakes to avoid

  • Spot bedding (five dabs of mortar): it leaves hollows that crack slabs and let water sit underneath.
  • No fall, or a fall towards the house.
  • Laying in frost, or when frost is forecast before the mortar sets.
  • Building sand instead of sharp sand in the bed: it’s too soft.
  • Skipping the sub-base on soft ground.