How to build a sleeper raised bed (UK guide)
Timber sleepers make sturdy, good-looking raised beds that last for years. A standard 2.4 × 1.2 m bed, two sleepers high, needs just six sleepers.
How do you build a sleeper raised bed?
Lay the sleepers on edge in a rectangle on level ground, stagger the joints if you build more than one course high, and fix them together securely. A 2.4 × 1.2 m bed two sleepers high (about 40 cm) needs 6 sleepers and holds about 880 litres of soil: 18 bags of 50 litres or 2 bulk bags.

How many sleepers do I need?
Standard sleepers are 2.4 m long, about 200 mm high and 100 mm thick, so each course adds about 20 cm of height.
| Bed (outside size) | Height | Sleepers |
|---|---|---|
| 2.4 × 1.2 m | 1 sleeper (about 20 cm) | 3 (2 sides + 1 cut into two 1.0 m ends) |
| 2.4 × 1.2 m | 2 sleepers (about 40 cm) | 6 |
| 2.4 × 1.2 m | 3 sleepers (about 60 cm) | 9 |
The end pieces sit between the long sides, so they’re 1.0 m long (1.2 m minus two 100 mm sleepers): one sleeper gives two ends, with a 40 cm offcut.
Step by step
- Choose a sunny, level spot and clear weeds or turf.
- Cut the end pieces to length with a saw suitable for heavy timber.
- Lay the first course on level ground or a few centimetres of sand, checking it’s level.
- Add the next course with the joints staggered, like brickwork, for strength.
- Fix the sleepers together with long timber screws or brackets, as your supplier advises.
- Line the inside (optional) to protect the timber, then fill with soil and compost.
How much soil do I need?

| Bed (outside 2.4 × 1.2 m) | Inside area | Soil | 50 L bags |
|---|---|---|---|
| 2 sleepers high (40 cm) | 2.2 × 1.0 m | 880 L | 18 (or 2 bulk bags) |
| 1 sleeper high (20 cm) | 2.2 × 1.0 m | 440 L | 9 (or 1 bulk bag) |
Measure the inside of the bed, not the outside: the sleepers take up space. Use the raised bed soil calculator, and for deep beds see our guide to filling raised beds in layers.
What mistakes should I avoid?
- Measuring the outside when buying soil, which over-orders.
- Stacking joints in line instead of staggering them.
- Weak fixings that let the corners spread when the bed is full.
- Building on a slope without levelling first.
Calculators for this job
More guides
Barrowload guide · UK · Figures are typical; always check your product and local rules.
How to plant a hedge (UK guide)
Pea shingle vs 20 mm gravel: which is best?
Post mix vs concrete for fence posts