How much slate do I need?

Slate chippings needed = length × width × depth. An area of 4 m × 2 m at 5 cm deep needs 0.4 m³, about 0.6 tonnes. Order 30 × 20 kg bags, or 1 bulk bag of 0.5 m³. Larger stones need a slightly deeper layer to avoid gaps.

On this page
Slate chippings border

Key facts

  • A 20 kg bag of slate chippings covers about 0.27 m² at 5 cm, so about 4 bags per m².
  • Decorative stone weighs about 1.5 tonnes per m³.
  • Lay stone over a weed membrane.
  • Larger stones need a slightly deeper layer.

How deep should decorative stone be?

Common depths, laid over a weed membrane:

Stone sizeTypical depthNotes
20 mm chippings4–5 cmGood coverage for borders
40 mm chippings5–7 cmLarger stones need more depth
Large feature rocksCount individuallyNot calculated by volume

How far does a tonne go?

If you already know how much you’re ordering, or want to check a delivery, here’s roughly how far slate chippings goes at common depths (at a typical 1.5 t/m³):

Amountat 4 cmat 5 cm
1 tonneabout 17 m²about 13 m²
5 tonnesabout 83 m²about 67 m²
10 tonnesabout 167 m²about 133 m²
20 tonnesabout 333 m²about 267 m²

Or enter the amount you have in the Already have some? box in the calculator, and it shows the area covered at your chosen depth.

Coverage and buying

Slate chippings are sold in 20–25 kg bags or bulk bags. At 5 cm deep, a 20 kg bag covers about 0.27 m², so you need roughly 4 bags per m². For larger areas, bulk bags are much cheaper.

Choosing decorative stone

TypeLookNotes
Slate chippingsFlat, blue-grey or plumGood for borders; can be sharp underfoot
PebblesRoundedComfortable to walk on, move more
Granite chippingsAngular, sparklyHard-wearing for paths

Laying it

  1. Clear weeds and level the area.
  2. Lay a weed membrane, overlapping joins.
  3. Fit edging to hold the stone.
  4. Spread the stone to an even depth.

What mistakes should I avoid?

  • No membrane, so stones sink and weeds come through.
  • Underestimating weight. Stone is heavy; plan delivery and moving it.
  • Too thin a layer with large stones, leaving gaps.
  • No edging to hold it in place.

How is it calculated?

Volume = length × width × depth, with depth converted to metres (cm ÷ 100). Circles, triangles and L-shapes use the matching area formula. Weight uses a typical 1.5 tonnes per m³; different stones vary. Bags and bulk amounts are rounded up, because you can’t buy part of a bag.

Worked examples

Border: 4 m × 2 m at 5 cm deep = 0.4 m³, about 0.6 tonnes. Order 30 × 20 kg bags, or 1 bulk bag of 0.5 m³.

Small feature area: 2 m × 1 m at 5 cm deep = 0.1 m³, about 0.15 tonnes. Order 8 × 20 kg bags, or 1 bulk bag of 0.5 m³.

Common questions

How much slate chippings do I need per m²?

At 5 cm deep, about 75 kg per m², roughly four 20 kg bags.

How deep should it be?

About 4–5 cm for small stones, more for larger ones.

Do I need a membrane?

Yes, it keeps stones clean and stops weeds.

How heavy is it?

Around 1.5 tonnes per m³; slate varies with size.

Bags or bulk?

Bags suit small features; bulk is far better value for borders and paths.

Can I use it on paths?

Yes, but flatter or angular stones are easier to walk on than round rocks.

How much will 20 tonnes of slate chippings cover?

About 267 m² at 5 cm deep, at a typical density. See the coverage table for other depths.

How much area does a tonne of slate chippings cover?

About 13 m² at 5 cm deep.