How much stone and binder does tar and chip need?

Tar and chip uses a sprayed asphalt binder covered with stone chips, rolled in. For a 60 × 12 ft driveway (80 sq yd), two coats on a new 4 in base: About 64 gallons of binder and 1.76 tons of stone chips, on 15.7 tons of compacted base. Use these figures to compare contractor quotes.

On this page
Gravel driveway leading to a house

Key facts

  • Tar and chip (chip seal) is hot or emulsified asphalt sprayed on a compacted base, then covered with stone chips and rolled.
  • Typical rates are about 0.30–0.45 gallons of binder and 18–25 lb of 3/8 in chips per square yard, per coat.
  • Driveways are often done in two coats for a tougher surface.
  • It’s usually a contractor job, because the binder is sprayed hot from a distributor truck.

Tar and chip vs gravel vs asphalt

GravelTar and chipAsphalt
SurfaceLoose stonesStones bonded in asphaltSmooth blacktop
LookRusticRustic, texturedSmooth, uniform
Loose stonesYes, needs rakingA few at first, then settlesNo
MaintenanceTop-ups and rakingResurface every several yearsSealcoating; crack repair
Who installsOften DIYUsually a contractorContractor

How it’s built

  1. A compacted gravel base, often 4–8 in of crushed stone, graded so water runs off.
  2. A coat of hot asphalt or asphalt emulsion sprayed evenly over the base.
  3. Stone chips spread immediately over the wet binder.
  4. Rolling to press the chips into the binder.
  5. A second coat of binder and chips, common on driveways.
  6. Sweeping away loose chips once it has cured.

Using this to check a quote

Contractors usually price tar and chip per square yard. Enter their price in the calculator to see the total for your driveway, and use the binder and chip quantities to ask sensible questions: how many coats, what chip size, and how deep a base is included. A very low quote may mean a single coat or no base work.

What mistakes should I avoid?

  • Skipping base work on a soft or rutted drive; the surface is only as good as the base.
  • Poor drainage: water sitting under the surface breaks it up.
  • Heavy turning too soon, which scuffs chips loose before they’ve bedded in.
  • Comparing quotes without checking the number of coats.

How is it calculated?

Area in square yards = square feet ÷ 9. Binder (gallons) = sq yd × rate × coats. Chips (lb) = sq yd × rate × coats, converted to tons (÷ 2,000) and to cubic yards at a typical loose 95 lb per cubic foot. Base = area × depth, at about 1.77 tons per cubic yard compacted.

Worked examples

Two-coat driveway on a new base (60 × 12 ft): About 64 gallons of binder and 1.76 tons of stone chips, on 15.7 tons of compacted base. Use these figures to compare contractor quotes.

Resurfacing an existing drive (100 × 10 ft, single coat, quote of $3/sq yd): About 44 gallons of binder and 1.22 tons of stone chips. Use these figures to compare contractor quotes. Estimated total: $333.33.

Sources

  • Kentucky Transportation Cabinet chip seal training: binder at about 0.30–0.38 gallons per square yard
  • Published chip seal projects: emulsion at 0.33–0.45 gallons and 3/8 in chips at 18–25 lb per square yard
  • Chip seal design guidance: a 3/8 in chip at a loose 95 lb per cubic foot gives about 20 lb per square yard

Rates vary with chip size, the surface and the binder; contractors adjust them on site.

Common questions

How much stone do I need for a tar and chip driveway?

Roughly 18–25 lb of 3/8 in chips per square yard for each coat. A 60 × 12 ft driveway with two coats needs about 1.8 tons.

How much asphalt binder does tar and chip use?

Typically 0.30–0.45 gallons per square yard per coat.

Is tar and chip a DIY job?

Usually not. The binder is sprayed hot from a distributor truck, so it’s normally done by a paving contractor. You can do the base preparation yourself.

How long does a tar and chip driveway last?

It varies with traffic, climate and base quality; many are resurfaced with a new coat every several years.

Single or double coat?

Driveways are often done in two coats for a tougher, more even surface; a single coat is common for resurfacing.

How is tar and chip priced?

Usually per square yard. Enter a quote in the calculator to see the total for your driveway.