How many pavers for a 10x10 patio? Paver sizes compared
A 10 × 10 ft patio is one of the most popular backyard projects. The number of pavers depends almost entirely on which size is chosen.
How many pavers does a 10x10 patio need?
A 10 × 10 ft patio covers 100 square feet. With narrow joints, it takes about 430 pavers of 4 × 8 in, 98 of 12 × 12 in or 56 of 16 × 16 in. Most installers add around 10% for cuts and breakage.

Which pavers size is right?
Small brick-style pavers suit curves and patterns; large square pavers lay faster and look more modern. Here’s how the common sizes compare for a 100 sq ft patio:
| Paver size | Pavers per sq ft | 10 × 10 ft patio | With 10% extra |
|---|---|---|---|
| 4 × 8 in (brick style) | About 4.3 | 430 | 473 |
| 6 × 9 in | About 2.6 | 258 | 284 |
| 12 × 12 in | About 1.0 | 98 | 108 |
| 16 × 16 in | About 0.56 | 56 | 61 |
| 24 × 24 in | About 0.25 | 25 | 28 |
So for anyone asking how many 16x16 pavers for a 10x10 patio, the answer is 56, or about 61 with spares.
How many pavers per square foot?
Divide 144 (the square inches in a square foot) by the paver’s face area, including a narrow joint. A 4 × 8 in paver works out at about 4.3 per square foot; a 12 × 12 in paver at just under 1.
How much gravel do I need for a 10x10 patio?

Pavers sit on a compacted base of crushed stone (paver base), usually 4 inches deep for patios. For 100 square feet, that’s about 1.23 cubic yards, or roughly 88 bags of 50 lb. Above a cubic yard or so, bulk delivery is usually cheaper than bags. The base quantity tool works it out for other sizes.
| 10 × 10 ft patio | Amount |
|---|---|
| Paver base, 4 in compacted | 1.23 cubic yards (about 88 × 50 lb bags) |
How many 4x8 pavers in a pallet?
Pallet quantities vary by manufacturer and paver thickness, so there’s no single figure. Suppliers usually list how many square feet of pavers on a pallet, and how many pieces, on the product page or pallet label. Dividing the patio’s square footage by that coverage gives the number of pallets, and leftover pieces can often be returned.
What does the build involve?
- Dig out the area to allow for the base, a 1 in sand bed and the pavers.
- Lay and compact the paver base in layers.
- Screed bedding sand about 1 in deep.
- Lay the pavers, keeping joints tight and the pattern straight.
- Add edge restraints and sweep joint sand into the gaps.
For exact numbers on any shape, the paver quantity tool handles size, joints and extra.
Calculators for this job
More guides
Barrowload guide · US · Figures are typical; always check your product and local rules.
How to build a raised garden bed (US guide)
How to grade a yard away from your house
Bagged vs bulk mulch: which should you buy?